Services
Passive House support at every project stage.
Every stage serves the same goal, that the finished building performs as designed. The work is organised in three stages, design, construction and certification, and you can engage us only for what you need. We work in Portugal and in any other country.
Stage 1
Design
From the first sketch to a design ready for the certifier’s review, before construction starts.
F1
Strategy and baseline review
We set the standard, target class and performance goals, and review the baseline design against the five Passive House principles.
F2
Modelling and assessment
A designPH and PHPP model, the energy balance, and the critical points and measures it reveals.
F3
Technical development
Opaque and glazed envelope, shading, heat-recovery ventilation, and heating, cooling and hot-water systems.
F4
Integration and design
Cost-performance review of solutions and suppliers, support to the engineering disciplines and detail review, so drawings and PHPP stay consistent.
F5
Design close-out
We consolidate the technical decisions and leave the design ready for the certifier’s review.
Stage 2
Construction
So that what was designed is what gets built.
F6
Construction and quality control
Optimising construction details, support in choosing solutions and contractors, site visits at the critical moments, and attendance at the airtightness tests.
Stage 3
Certification
Certification is issued by an accredited, independent certifier hired by the client. We prepare and follow the whole process.
E3 optional
Certification support
We compile and submit the file, follow the design-stage and final reviews, and update the PHPP to the as-built state.
After handover
In use
Performance keeps being checked once the home is lived in.
E4 optional
Post-occupancy monitoring
We measure energy use, temperature, humidity and indoor air quality, and compare the real values with the PHPP.
Existing buildings
EnerPHit retrofit
The EnerPHit standard applies the same principles to existing buildings, including heritage buildings. Every retrofit has its own scope, defined case by case.
Not sure which stage you need?
Describe the project and we will tell you where to start.