Passiva Collective

Services

Passive House support at every project stage.

Every stage serves the same goal, that the finished building performs as designed. The work is organised in three stages, design, construction and certification, and you can engage us only for what you need. We work in Portugal and in any other country.

Stage 1

Design

From the first sketch to a design ready for the certifier’s review, before construction starts.

  1. F1

    Strategy and baseline review

    We set the standard, target class and performance goals, and review the baseline design against the five Passive House principles.

  2. F2

    Modelling and assessment

    A designPH and PHPP model, the energy balance, and the critical points and measures it reveals.

  3. F3

    Technical development

    Opaque and glazed envelope, shading, heat-recovery ventilation, and heating, cooling and hot-water systems.

  4. F4

    Integration and design

    Cost-performance review of solutions and suppliers, support to the engineering disciplines and detail review, so drawings and PHPP stay consistent.

  5. F5

    Design close-out

    We consolidate the technical decisions and leave the design ready for the certifier’s review.

Stage 2

Construction

So that what was designed is what gets built.

  1. F6

    Construction and quality control

    Optimising construction details, support in choosing solutions and contractors, site visits at the critical moments, and attendance at the airtightness tests.

Stage 3

Certification

Certification is issued by an accredited, independent certifier hired by the client. We prepare and follow the whole process.

  1. E3 optional

    Certification support

    We compile and submit the file, follow the design-stage and final reviews, and update the PHPP to the as-built state.

After handover

In use

Performance keeps being checked once the home is lived in.

  1. E4 optional

    Post-occupancy monitoring

    We measure energy use, temperature, humidity and indoor air quality, and compare the real values with the PHPP.

Existing buildings

EnerPHit retrofit

The EnerPHit standard applies the same principles to existing buildings, including heritage buildings. Every retrofit has its own scope, defined case by case.

Not sure which stage you need?

Describe the project and we will tell you where to start.

Discuss your project