The performance gap
Many buildings use more energy than their design predicted.
The gap comes from unresolved thermal bridges, air leaks, materials swapped on site and simplified calculations. The Passive House method exists to reduce it to a minimum, because every decision is calculated, detailed, checked on site and measured at the end.
Calculate precisely
A detailed PHPP model instead of simplified estimates.
Resolve the details
A thermal-bridge-free strategy and airtightness planned junction by junction.
Check the site
Site visits and a check on every material substitution.
Measure the result
Airtightness test and independent certification.